| Full blown packages... | |
Cricket is flexible system
for monitoring trends in time-series data. I wrote several modules
which basically use ssh to
acquire data from remote hosts with minimal or no installation on
monitored host (apart from .ssh/authorized_keys setup). They
include monitoring of:
| |
|
Download whole tar-ball or examine
ChangeLog,
CVS or
README
[fm]
cricket-modules.tar.gz 22 Kb | |
Mon is
tool used for monitoring service availability and triggering alerts.
I wrote or modified several modules for it:
| |
|
All modules available for mon or take a look at
ChangeLog
or CVS
[fm]
mon-modules.tar.gz 27 Kb | |
|
omni_gantt -- Work in progress omni_gantt is a package consisting of three scripts which use OmniBack command-line client under Linux:
Together those package provides powerful and easy to use web reporting for OmniBack, much better than built-in html output without any hyper-links (you should really wonder why they decided to output html without any links...). This package, however, have some visual BUGS which I have to solve before releasing 0.0 version. Gantt chars tend to get too wide. It's actually a design decision. I opted to show any event with at least two pixels wide bar in chart. That enables you to see status of that backup (by just moving mouse over spot) or see details (by clicking on it). I think that narrower segments (or skipping some really short events) is not valid option. However, it produces quite strange graphs at some times. But, it's useful for us in current form also, so I decided to release it early (after 10 months of usage). I would also like to see versions ported to other databases (but, why? PostgreSQL is great :-) and/or to other backup systems (preferably Open Source ones). I'm not quite sure that I will do any of this. But, it's here, under GPL license, so you could give it a try. | |
|
All modules available for omni_gantt or take a look at
ChangeLog,
CVS or
screenshot
omni_gantt.tar.gz 10 Kb | |
| psinib - Perl Snapshot Is Not Incremental Backup is script for backup of Samba/CIFS shares to central disk space with snapshots and it has it's own page. | |
| You really should rename scripts below before using them! By default, files have _download as extension to prevent web server execution. However, you will want to remove that extension before using them (and chmod 755 to make them executable). All those projects have CVS repository which you can browse. | |
|
script which reads syslog maillog (from multiple servers running sendmail
and/or postfix) and follows each message as it hops from server to server.
Output is written on message-by-message basis.
This script is extremely useful if your messages from multiple mail servers arrive in syslog out of order or interleaved with messages from other servers. maillog_flow.pl 3.0 Kb | |
|
Perl (!) script to produce index file for
HouseSpider,
an Java applet that adds indexing and search capability to your web site.
It's much easier to use than suggested appletviewer and you can customize it to remove some parts of your web page (e.g. navigation) HouseSpider.pl 1008 bytes | |
|
Did you ever needed to re-create your primary DNS server from secondary DNS?
Did you try to read secondary bind DNS zone? Well, this script will sort it
for you by IP numbers (and separate each B-class network -- but that's
configurable)
sort_bindzone.pl 1.7 Kb | |
|
Send different attachments and same message to bunch of people, needs
MIME::Lite from CPAN
email_attachements.pl 2.6 Kb | |
|
Remove some messages (e.g. Love Letter virus) from multiple mboxes. Very
fast, some assembly required; based on code by David Luyer.
fix_mbox.pl 1.9 Kb | |
|
Take a directory of inboxes (in mbox format) and re-mail them through sendmail
to check for viruses, expand aliases/forwards etc, etc...
mbox2sendmail.pl 819 bytes | |
|
Create passwd and shadow file for Linux PAM from Digital
Unix (a.k.a. OSF) /etc/passwd file (no support for C2!)
osf2pam.pl 2.1 Kb | |
|
Draws graphs (signal and transfer) of your wireless card. Uses
RRDTOOL.
It can also draw normal ethernet interfaces for comparison.
istatd.pl 5.8 Kb | |
| Shell script which will create terminal GUI to apt-cache search with ability to install package. Nothing else, nothing more, but much faster than aptitude for this simple task. | |
|
This is semi-inteligent script which tries to make diff between two
directories which can have slightly different files (e.g. with or
without .in at end of filename) or different directory structure. It won't
work well if you have files which have same name in more than one place in
source directory!
diff_dirs 703 bytes |